Silksworth Leisure Centre

Working in conjunction with Dutch company Pellikaan Construction, Devlin Interiors spent 6 months working on the construction of a new 25m swimming pool, along with the refurbishment of the existing indoor Tennis Centre. Through the installation of suspended ceilings, metal stud partitions, fire protection and a mezzanine floor, both the new and old structures were transformed into modern, aesthetic buildings whilst adhering to the standards required to cope with the harsh atmosphere of a swimming pool.

 

sdc10239
sdc10239
sdc10263
sdc10316
sdc10319
sdc10320
sdc10321
sdc10325
sdc10331
sdc10375
sdc10377
sdc10378
sdc10379
sdc10380
sdc10382
sdc10383
sdc10384